Liskeard and Caradon Railway - Construction

Construction

Construction started at once; it seems that it was mostly carried out by direct labour under Coad's control. Some modifications to the route were required as Coad's original alignment was found to be impracticable in certain details. Work started at the Cheesewring, and the permanent way used stone block sleepers, the stone blocks being procured at Cheesewring itself. Lower down, serious problems were encountered in gaining possession of land from the Duchy of Cornwall, who were demanding very high prices for the land. The railway construction was costing more than had been estimated, and at the same time some subscribers were not responding to calls on shares they had taken up. The Company found itself unable to pay the Duchy's price.

Loans were taken out – apparently beyond what was authorised in the Act – and to obtain some income the Company decided to open the railway as far as they could, down to Tremabe, on 28 November 1844. It is not clear how attractive the short railway transit was, involving an additional trans-shipment to road transport there.

The line was finally extended to Moorswater, opening about 8 March 1846 – the date is not certain. The proposed Tokenbury branch was not built, no doubt due to lack of funds. The tunnels originally contemplated were also avoided, but there was a rope worked incline at Gonamena to climb towards Cheesewring.

The construction had cost £27,000; about £11,000 of that was beyond the sum authorised by Parliament; by an Act of 25 June 1847 further capital of £10,500 and loans of £3,500 were authorised.

Read more about this topic:  Liskeard And Caradon Railway

Famous quotes containing the word construction:

    When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.
    Edmund Burke (1729–1797)

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)