Lisburn Railway Station - Current Building

Current Building

It has been renovated, with a new waiting area on platform 1, new toilets and vending machines. addition, on platforms 2 and 3, a coffee shop operates on weekday mornings, to accommodate commuters travelling towards Belfast. To make the station more accessible, lifts have been installed on each platform.

In addition to Lisburn being a stop off on the Bangor to Portadown line, platform 3 is used in peak times for an extra service - Lisburn to Bangor - and stops at all halts between here and Great Victoria Street. After calling at Belfast Central these services operate semi-fast to Bangor calling at only Holywood and Bangor West. Platform 2 is used for the express, non-stop service to Great Victoria Street. This means journey times between Lisburn and Great Victoria Street are reduced to only 11 minutes at peak times, which has attracted many more commuters than before. Despite the timetable stating the time between the two station non-stop as 11 minutes, some trains can achieve the journey in as little as 8 minutes; an average speed of around 60 mph.

Read more about this topic:  Lisburn Railway Station

Famous quotes containing the words current and/or building:

    We all participate in weaving the social fabric; we should therefore all participate in patching the fabric when it develops holes—mismatches between old expectations and current realities.
    Anne C. Weisberg (20th century)

    Nowadays almost all man’s improvements, so called, as the building of houses and the cutting down of the forest and of all large trees, simply deform the landscape, and make it more and more tame and cheap.
    Henry David Thoreau (1817–1862)