EmX (Bus Rapid Transit in Eugene)
In addition to the fixed bus routes, LTD operates a bus rapid transit line from downtown Eugene to the Gateway area in north Springfield, via downtown Springfield. The BRT line, named the Emerald Express (EmX), began operations in January 2007. The first corridor connects downtown Eugene to downtown Springfield and runs primarily along Franklin Boulevard. A second EmX corridor, the Gateway EmX extension, began service in January 2011. The Gateway EmX extension connects downtown Springfield and the Gateway area in north Springfield. LTD chose bus rapid transit after a review process during which several transportation options, including light rail, were considered. It concluded that this was the best option for Eugene-Springfield's size and current transportation needs. LTD is currently in the process of expanding EmX to the West Eugene area. The addition will add 4.4 miles to EmX's current line, while also adding a new bike lane, two new bike and pedestrian bridges, and 4.7 miles of new, wider sidewalks installed along West 6th, 7th, and 11th Avenues.
Read more about this topic: Lane Transit District
Famous quotes containing the words rapid and/or transit:
“Five oclock tea is a phrase our rude forefathers, even of the last generation, would scarcely have understood, so completely is it a thing of to-day; and yet, so rapid is the March of the Mind, it has already risen into a national institution, and rivals, in its universal application to all ranks and ages, and as a specific for all the ills that flesh is heir to, the glorious Magna Charta.”
—Lewis Carroll [Charles Lutwidge Dodgson] (18321898)
“My esoteric doctrine, is that if you entertain any doubt, it is safest to take the unpopular side in the first instance. Transit from the unpopular, is easy ... but from the popular to the unpopular is so steep and rugged that it is impossible to maintain it.”
—William Lamb Melbourne, 2nd Viscount (17791848)