The place where the station is situated was formerly a large goods yard. The present car and bus parking areas, as well as the path to the station, formed part of a coal loading yard. The present-day platforms were once used as goods lines and formed part of the large Chitpur Rail Yard.

In 2000, the first plans were made to utilise this area as a railway station, since the rapid growth of long distance passengers was overcrowding the Sealdah station. Due to limitations of space, new platform construction is restricted at Sealdah. Two new platforms (9A & 9B) constructed between 2004 and 2005 proved insufficient. Due to its central position in Kolkata, the Sealdah station is too busy for suburban train traffic. To overcome this problem, Eastern Railways suggested constructing another large railway station in Kolkata, to cater mostly to long distance trains.The decision to build a terminal at Chitpur came after a lot of deliberation and a process of elimination. Different locations were suggested for the station site. Three years ago, Majerhat was suggested as a possible location. The idea was shelved owing to technical difficulties involving the construction of a bridge over the Hooghly river from Bauria to Budge Budge. Then there was Shalimar, in Howrah district, which was already a goods terminal operating under the South Eastern Railway. In fact, a passenger service on a trial basis was also started from there through two pairs of trains. But the project could not take off owing to certain problems relating to infrastructure and the considerable distance of the terminal from Kolkata proper.Chitpur was decided upon finally and approved by the Railway Ministry in 2003-04. Certain inherent advantages helped in the selection of this place. Other than being located in the heart of Kolkata, Chitpur has already functioned as an important rail yard for around a century. Moreover, unlike in the case of Majerhat and Shalimar, the huge property in and around the place belongs to the Railways. The proposal has been accepted by the Kolkata Metropolitan Development Authority (KMDA), and on May 15, 2003, West Bengal Chief Minister Buddhadeb Bhattacharjee laid the foundation stone for the project.

Construction started in 2004. The tracks from the coal-yard were closed first, and then a large portion of electrified goods tracks were shut down. Those tracks, masts and wires were demolished. Next, the Dumdum - Majherhat link rail line's (Kolkata Circular Railway) track was temporarily re-aligned. This action permitted the construction of platforms, station buildings and a parking area to begin. After construction was completed, the circular rail tracks were aligned as before, now via the new station. Other tracks were re-aligned, and completely electrified for passenger coaches shunting (up to side of Tala station). Tracks in the opposite direction, which were not electrified and underutilized, were re-laid, re-aligned and fully electrified for goods trains (with wagon to lorry transfer facility). Part of the former electrified goods lines, which were closed, now entered use as a coach siding.

After these, the official inauguration occurred in January 2006.

Read more about this topic:  Kolkata Railway Station

Famous quotes containing the word history:

    The history of mankind interests us only as it exhibits a steady gain of truth and right, in the incessant conflict which it records between the material and the moral nature.
    Ralph Waldo Emerson (1803–1882)

    I believe that history has shape, order, and meaning; that exceptional men, as much as economic forces, produce change; and that passé abstractions like beauty, nobility, and greatness have a shifting but continuing validity.
    Camille Paglia (b. 1947)

    The history of all hitherto existing society is the history of class struggles.
    Karl Marx (1818–1883)