Klondike Wind farm is located in Sherman County, east of the small agricultural community of Wasco, in the north-central part of the U.S. state of Oregon. It was built in four phases and is owned and operated by Iberdrola. The first phase was built in 2001 and the latest in 2008.
Phase | Capacity (MW) | Type | number of turbines |
---|---|---|---|
Klondike I | 24 | Enron Wind | 16 |
Klondike II | 75 | GE Energy | 50 |
Klondike III | 120 | GE Energy | 80 |
101.2 | Siemens | 44 | |
2.4 | Mitsubishi | 1 | |
Klondike IIIa | 76.5 | GE Energy | 51 |
Total | 399.1 | 242 |
The wind farm is currently a test site for some new wind turbines, notably the Mitsubishi MWT92, a 2.4 megawatt turbine with a rotor diameter larger than the wingspan of any production aircraft at 92 meters, manufactured in Japan. During the construction of the last phase, an accident killed one worker and injured another.
Famous quotes containing the words wind and/or farm:
“Fair stood the wind for France,
When we our sails advance,
Nor now to prove our chance
Longer will tarry;”
—Michael Drayton (15631631)
“Wind goes from farm to farm in wave on wave,
But carries no cry of what is hoped to be.
There may be little or much beyond the grave,
But the strong are saying nothing until they see.”
—Robert Frost (18741963)