Kisei Main Line - Basic Data

Basic Data

  • Operators, distances:
    • Total: 384.2 km
    • Central Japan Railway Company (category 1)
      • Kameyama - Shingū: 180.2 km
    • West Japan Railway Company (category 1)
      • Shingū - Wakayamashi: 204.0 km
    • Japan Freight Railway Company (category 2)
      • Kameyama - Shingū: 180.2 km
      • Shingū - Kii-Sano: 6.4 km
  • Track
    • Double: Kii-Tanabe - Wakayama
    • Single: the remainder
  • Traction
    • Kameyama - Shingū: internal combustion
    • Shingū - Wakayama - Wakayamashi: Electrified 1,500 V DC
  • Railway signalling:
    • Kameyama - Shingū: Special Automatic (ja:閉塞方式#特殊自動閉塞式), a simplified automatic system
    • Shingū - Wakayama: Automatic
  • Centralized traffic control (CTC) center:
    • Kameyama - Shingū: Tōkai Operation Control Center
    • Shingū - Wakayamashi: Tennōji Operation Control Center

Read more about this topic:  Kisei Main Line

Famous quotes containing the words basic and/or data:

    There’s a basic rule which runs through all kinds of music, kind of an unwritten rule. I don’t know what it is. But I’ve got it.
    Ron Wood (b. 1947)

    This city is neither a jungle nor the moon.... In long shot: a cosmic smudge, a conglomerate of bleeding energies. Close up, it is a fairly legible printed circuit, a transistorized labyrinth of beastly tracks, a data bank for asthmatic voice-prints.
    Susan Sontag (b. 1933)