Just in Sequence Is Just in Time
Just in Sequence (JIS) is just one specialised strategy to achieve Just In Time (JIT). The process concept of JIT sees buffers at the production line as waste in capital bound. The aim is to eliminate buffers as much as possible at expense of stability when disturbances arise. Just In Sequence is one of the most extreme applications of the concept, where components arrive Just In Time and sequenced for consumption.
The sequencing allows companies to eliminate supply buffers as soon as the quantity in component part buffers necessary is reduced to a minimum. If not sequencing according to scheduled variety of production, all required components must be stocked in buffers. For flexible production lines, such as a modern automotive assembly line, the variety is an option to produce directly on customer orders. As soon as the next order arrives at the work center, the scheduler distributes the supply orders inline with the production sequence of the final production line.
Read more about this topic: Just In Sequence
Famous quotes containing the words sequence and/or time:
“It isnt that you subordinate your ideas to the force of the facts in autobiography but that you construct a sequence of stories to bind up the facts with a persuasive hypothesis that unravels your historys meaning.”
—Philip Roth (b. 1933)
“Everything ponderous, viscous, and solemnly clumsy, all long- winded and boring types of style are developed in profuse variety among Germansforgive me the fact that even Goethes prose, in its mixture of stiffness and elegance, is no exception, being a reflection of the good old time to which it belongs, and a reflection of German taste at a time when there still was a German tasteMa rococo taste in moribus et artibus.”
—Friedrich Nietzsche (18441900)