Just in Sequence - Just in Sequence Is Just in Time

Just in Sequence Is Just in Time

Just in Sequence (JIS) is just one specialised strategy to achieve Just In Time (JIT). The process concept of JIT sees buffers at the production line as waste in capital bound. The aim is to eliminate buffers as much as possible at expense of stability when disturbances arise. Just In Sequence is one of the most extreme applications of the concept, where components arrive Just In Time and sequenced for consumption.

The sequencing allows companies to eliminate supply buffers as soon as the quantity in component part buffers necessary is reduced to a minimum. If not sequencing according to scheduled variety of production, all required components must be stocked in buffers. For flexible production lines, such as a modern automotive assembly line, the variety is an option to produce directly on customer orders. As soon as the next order arrives at the work center, the scheduler distributes the supply orders inline with the production sequence of the final production line.

Read more about this topic:  Just In Sequence

Famous quotes containing the words sequence and/or time:

    We have defined a story as a narrative of events arranged in their time-sequence. A plot is also a narrative of events, the emphasis falling on causality. “The king died and then the queen died” is a story. “The king died, and then the queen died of grief” is a plot. The time sequence is preserved, but the sense of causality overshadows it.
    —E.M. (Edward Morgan)

    The American is said to become full-flavored, and in time a most all-round man, through the polish which Europe can impart.
    M. E. W. Sherwood (1826–1903)