John Butters Power Station is the power station built by Hydro Tasmania for the King River Power Scheme in Western Tasmania

It has one Francis turbine, with a generating capacity of 144 MW of electricity, and is remotely controlled from the Sheffield Control Centre

Water is fed from Lake Burbury which is dammed by the Crotty Dam in the gap in the West Coast Range between Mount Jukes and Mount Huxley, and to the south by Darwin Dam.

The power station is named after Hydro Tasmania's first general manager and chief engineer, John Butters.

It was one of the last hydro electric power stations built by the HEC before its disaggregation and transformation to Hydro Tasmania

Famous quotes containing the words power and/or station:

    A state that denies its citizens their basic rights becomes a danger to its neighbors as well: internal arbitrary rule will be reflected in arbitrary external relations. The suppression of public opinion, the abolition of public competition for power and its public exercise opens the way for the state power to arm itself in any way it sees fit.... A state that does not hesitate to lie to its own people will not hesitate to lie to other states.
    Václav Havel (b. 1936)

    It was evident that the same foolish respect was not here claimed for mere wealth and station that is in many parts of New England; yet some of them were the “first people,” as they are called, of the various towns through which we passed.
    Henry David Thoreau (1817–1862)