John Butters Power Station is the power station built by Hydro Tasmania for the King River Power Scheme in Western Tasmania
It has one Francis turbine, with a generating capacity of 144 MW of electricity, and is remotely controlled from the Sheffield Control Centre
Water is fed from Lake Burbury which is dammed by the Crotty Dam in the gap in the West Coast Range between Mount Jukes and Mount Huxley, and to the south by Darwin Dam.
The power station is named after Hydro Tasmania's first general manager and chief engineer, John Butters.
It was one of the last hydro electric power stations built by the HEC before its disaggregation and transformation to Hydro Tasmania
Famous quotes containing the words power and/or station:
“The continuance of our passions is no more in our own power than the term of our life.”
—François, Duc De La Rochefoucauld (16131680)
“Say first, of God above, or Man below,
What can we reason, but from what we know?
Of Man what see we, but his station here,
From which to reason, or to which refer?
Thro worlds unnumberd tho the God be known,
Tis ours to trace him only in our own.
”
—Alexander Pope (16881744)