The Jersey-Atlantic Wind Farm in Atlantic City, New Jersey, is the first coastal wind farm in the United States and the first wind farm in New Jersey. It became operational in December 2005 and consists of five 1.5 MW turbines built by General Electric. Each wind turbine reaches a height of 380 feet (120 m).
The wind farm is located at the Atlantic County Utilities Authority (ACUA) Wastewater Treatment Plant on U.S. Route 30 and is visible from highways approaching Atlantic City. The treatment plant will use between 35% and 60% of the wind-generated capacity from the wind turbines, providing about 50% of the wastewater plant's electricity needs, with the remaining energy being provided to the main power grid for resale as premium renewable electricity.
Famous quotes containing the words wind and/or farm:
“I have hardly begun to live on Staten Island yet; but, like the man who, when forbidden to tread on English ground, carried Scottish ground in his boots, I carry Concord ground in my boots and in my hat,and am I not made of Concord dust? I cannot realize that it is the roar of the sea I hear now, and not the wind in Walden woods. I find more of Concord, after all, in the prospect of the sea, beyond Sandy Hook, than in the fields and woods.”
—Henry David Thoreau (18171862)
“In common with other rural regions much of the Iowa farm lore concerns the coming of company. When the rooster crows in the doorway, or the cat licks his fur, company is on the way.”
—For the State of Iowa, U.S. public relief program (1935-1943)