The Jersey-Atlantic Wind Farm in Atlantic City, New Jersey, is the first coastal wind farm in the United States and the first wind farm in New Jersey. It became operational in December 2005 and consists of five 1.5 MW turbines built by General Electric. Each wind turbine reaches a height of 380 feet (120 m).
The wind farm is located at the Atlantic County Utilities Authority (ACUA) Wastewater Treatment Plant on U.S. Route 30 and is visible from highways approaching Atlantic City. The treatment plant will use between 35% and 60% of the wind-generated capacity from the wind turbines, providing about 50% of the wastewater plant's electricity needs, with the remaining energy being provided to the main power grid for resale as premium renewable electricity.
Famous quotes containing the words wind and/or farm:
“The forest of Compiegne. Look at it. Like a kind grandmother dozing in her rocking chair. Old trees practicing curtsies in the wind because they still think Louis XIV is king.”
—Billy Wilder (b. 1906)
“On the farm I had learned how to meet realities without suffering either mentally or physically. My initiative had never been blunted. I had freedom to succeedfreedom to fail. Life on the farm produces a kind of toughness.”
—Bertha Van Hoosen (18631952)