Financing and Contracting
The IRĀ£70 million design and construct contract was awarded by the Cork Corporation on behalf of the National Roads Authority. The NRA received financial assistance from the Cohesion Fund of the European Union.
In the early 90s, Ewbank Preece OhEocha (formerly DeLeuw Chadwick OhEocha, and later to become part of Mott MacDonald) supervised a major geotechnical investigation, conducted a hydraulic study of the river, and carried out an environmental impact study. Ewbank Preece OhEocha, in association with Symonds Travers Morgan, produced a conceptual design and tender documents for Cork Corporation on a design and construct format based on geometric and performance specification. Thirteen parties showed interest in the contract. From these, four consortia were selected and Cork Corporation made a final contract decision in December 1994. As is typical on a large-scale project of this type, the chosen contractor was a joint venture of Tarmac Walls JV, formed by Tarmac Construction, now a division of Carillion, and P.J. Walls (Civil) Ltd., part of Ireland's Walls Group. Subcontractors then handled many of the key tasks of construction.
Read more about this topic: Jack Lynch Tunnel
Famous quotes containing the word contracting:
“When I hear the hypercritical quarreling about grammar and style, the position of the particles, etc., etc., stretching or contracting every speaker to certain rules of theirs ... I see that they forget that the first requisite and rule is that expression shall be vital and natural, as much as the voice of a brute or an interjection: first of all, mother tongue; and last of all, artificial or father tongue. Essentially your truest poetic sentence is as free and lawless as a lambs bleat.”
—Henry David Thoreau (18171862)