Future
The remaining portion of the Western Wake Freeway from US 64 south to NC 55 in Holly Springs should open by January 2013.
The Southern Wake Expressway would connect Holly Springs with Garner. The route for the southern leg known as the Orange Route, on maps since the 1990s, would affect only a few people, but it would potentially hurt the endangered dwarf wedge mussel, so the U.S. Fish and Wildlife Service asked for other routes to be considered. In September 2010, a new map showed several other routes, including the controversial Red Route, which many Garner-area residents protested in a December 2010 meeting; a total of 3,000 signatures on petitions opposed the route as well. A Pink Route would run along the Orange Route to Lake Benson and then join with the Red Route at I-40; residents opposed this plan as well. Another possibility would be to prevent pollution that would affect the mussels, mainly around bridges.
Read more about this topic: Interstate 540 (North Carolina)
Famous quotes containing the word future:
“I dont see much future for the Americans.... Everything about the behavior of American society reveals that its half Judaized, and the other half negrified. How can one expect a State like that to hold together?”
—Adolf Hitler (18891945)
“The person who does not worry about the future will shortly have worries about the present.”
—Chinese proverb.
Confucian Analects.
“It lives less in the present
Than in the future always,
And less in both together
Than in the past.”
—Robert Frost (18741963)