Cost and Time Estimates
The Reference Design Report estimates the cost of building the ILC, excluding R&D, prototyping, land acquisition, underground easement costs, detectors, contingencies, and inflation, at US$6.75 billion (in 2007 prices). From formal project approval, completion of the accelerator complex and detectors is expected to require seven years. The host country would be required to pay $1.8 billion for site-specific costs like digging tunnels and shafts and supplying water and electricity.
U.S. Secretary of Energy Steven Chu estimates the total cost to be US$25 billion. ILC Director Barish says this is likely to be an overestimate. Other Department of Energy officials have estimated a $20 billion total.
Read more about this topic: International Linear Collider
Famous quotes containing the words cost, time and/or estimates:
“It is not enough for theory to describe and analyse, it must itself be an event in the universe it describes. In order to do this theory must partake of and become the acceleration of this logic. It must tear itself from all referents and take pride only in the future. Theory must operate on time at the cost of a deliberate distortion of present reality.”
—Jean Baudrillard (b. 1929)
“Here or henceforward it is all the same to me, I accept Time absolutely.”
—Walt Whitman (18191892)
“A State, in idea, is the opposite of a Church. A State regards classes, and not individuals; and it estimates classes, not by internal merit, but external accidents, as property, birth, etc. But a church does the reverse of this, and disregards all external accidents, and looks at men as individual persons, allowing no gradations of ranks, but such as greater or less wisdom, learning, and holiness ought to confer. A Church is, therefore, in idea, the only pure democracy.”
—Samuel Taylor Coleridge (17721834)