Integrated Carbon Observation System - Implementation Strategy

Implementation Strategy

The implementation of ICOS will take place in two steps: During the Preparatory Phase starting in 2008 until 2011, the funding commitments will have to be endorsed by the governments and mother institutions, the building of the central facilities will be initiated, and the project will be technically developed up to the level of a demonstration year of full operation, but with a reduced number of observational sites.The ICOS preparatory phase includes 16 research laboratories from 12 European countries, coordinated in France.

During the follow-up Operational Phase from 2012 until 2031, after the full scale deployment of the network, it will be run in an operational mode, and greenhouse gas concentrations and fluxes will be determined on a routine basis.

Read more about this topic:  Integrated Carbon Observation System

Famous quotes containing the word strategy:

    Our strategy in going after this army is very simple. First we are going to cut it off, and then we are going to kill it.
    Colin Powell (b. 1937)