HMS Blake (C99) - Construction and Commissioning

Construction and Commissioning

In 1954, construction of Blake resumed, but to a new design. The new design was approved in 1951, but construction did not resume until 1954. She would have fully automatic 6 inch guns in twin high-angle mounts with each gun capable of shooting 20 rounds per minute, and a secondary battery of fully automatic 3 inch guns which delivered 90 rounds per minute per gun. She would have no lighter anti-aircraft armament or torpedo tubes. Air conditioning was fitted throughout the ship, and a 200-line automatic telephone exchange was installed. Each 6 inch and 3 inch mounting had its own director, linked to a dedicated radar on the director. On 18 March 1961, Blake finally commissioned into the Royal Navy, the last cruiser to do so. Just two years later, she was placed in reserve.

Read more about this topic:  HMS Blake (C99)

Famous quotes containing the word construction:

    When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.
    Edmund Burke (1729–1797)