Following several years of aborted startup attempts, during which time the federal government was forced to increase its liability stake in the project by forming the Crown Corporation Canada Hibernia Holding Corporation, the Hibernia megaproject began construction of the production platform and gravity base structure in the early 1990s.

The Hibernia offshore oil field is owned jointly by ExxonMobil Canada (33.125%), Chevron Canada Resources (26.875%), Suncor (20%), Canada Hibernia Holding Corporation (8.5%), Murphy Oil (6.5%) and StatoilHydro Canada Ltd (5%).

As the Hibernia field was located in an inhospitable environment consisting of rogue waves, fog, icebergs and sea ice, hurricanes, and nor'easter winter storms, engineering analyses determined that the most appropriate drilling platform would be in the form of a gravity base structure (GBS).

The Hibernia GBS sits on the ocean floor approximately 80 m (260 ft) depth with its topsides extending approximately 50 m (160 ft) out of the water. The platform acts as a small concrete island with serrated outer edges designed to counter icebergs. The GBS contains production storage tanks and the remainder of the void space is filled with magnetite ballast with the entire structure weighing in at 1,200,000 t (1,300,000 short tons). The GBS was constructed in Bull Arm and the "topsides" production and living quarters was attached to the base while floating in Bull Arm, before the integrated unit (production platform and GBS) was towed out to the actual Hibernia field.

Production commenced on November 17, 1997 and Hibernia has proven to be the most prolific oil well in Canada, with initial production rates in excess of 50,000 bbl (7,900 m3) per day from a single well. A dedicated fleet of shuttle tankers continuously operates between the platform and an onshore transshipment facility at Whiffen Head, adjacent to an oil refinery at Come By Chance.

The development of Hibernia involves a considerable amount of drilling services. As of January 1, 2007, over 50 development wells have been successfully drilled from the platform, including several world record "extended reach drilling" wells.

The platform always has at least one logistics support vessel in attendance, which shuttle supplies and provides on-station emergency support. These support vessels are also tasked during the spring and summer months to tow small and medium-sized ice bergs which might collide with the platform, even though the GBS is engineered to withstand such a hit. The crew consists of 280 people who spend 3 weeks on the platform and three weeks on land, flown to and from the platform by helicopter.

The platform has been used to refuel CH-149 Cormorant search and rescue helicopters on long-range missions in the North Atlantic.

Read more about this topic:  Hibernia Oil Field

Famous quotes containing the word development:

    Such condition of suspended judgment indeed, in its more genial development and under felicitous culture, is but the expectation, the receptivity, of the faithful scholar, determined not to foreclose what is still a question—the “philosophic temper,” in short, for which a survival of query will be still the salt of truth, even in the most absolutely ascertained knowledge.
    Walter Pater (1839–1894)

    Somehow we have been taught to believe that the experiences of girls and women are not important in the study and understanding of human behavior. If we know men, then we know all of humankind. These prevalent cultural attitudes totally deny the uniqueness of the female experience, limiting the development of girls and women and depriving a needy world of the gifts, talents, and resources our daughters have to offer.
    Jeanne Elium (20th century)

    To be sure, we have inherited abilities, but our development we owe to thousands of influences coming from the world around us from which we appropriate what we can and what is suitable to us.
    Johann Wolfgang Von Goethe (1749–1832)