Hatherton Canal - Route

Route

The canal leaves the main line of the Staffordshire and Worcestershire Canal at Calf Heath. There is a large marina on its north side, close to the junction, after which a bridge carries a minor road over the canal, before it enters the first lock. Above the lock, a wider section provides additional mooring space before the second lock. This has been modified to include a ledge to one side, which provides dry dock facilities for the nearby boatyard. Exit from the top of the lock by boat is not possible.

Beyond the lock, there is a section which could be dredged to return it to navigable condition, but the M6 motorway has been built across it. A culvert maintains the flow of water under the motorway, but is not big enough for navigation. However, the motorway embankment is high enough to allow the insertion of a navigable culvert. Just before the motorway was Dog Bridge, but this was demolished and the road it carried was realigned as part of the motorway construction. One possible solution would be build a new lock beyond the road, to replace lock 2, and lower the level of the canal between. Beyond the motorway, Scrawpers End Bridge carries Oak Lane over the canal, but it has been lowered, leaving around 4 feet (1.2 m) of headroom. A replacement lift bridge might be required here. Next is the feeder from Gailey reservoirs, which has ensured that the channel has remained intact, since the water supplies the main line.

Saredon Mill bridge is in good condition, after Trust volunteers rebuilt the parapets. Considerable work has been done beyond it to remove trees and reinstate the towpath, creating a useful walking route. Cross bridge has again been lowered, but carries sufficient traffic that a lift bridge is not an option. The channel is in water, and is almost navigable here. Cats Bridge was replaced by a culvert, after it suffered from subsidence. An accommodation bridge beyond it was demolished by the Trust, as it had cracked and sunk as a result of subsidence. It is unlikely to be replaced, since it no longer served a useful purpose.

A weir on Saredon Brook supplies more water to the channel before it enters Meadow Lock, the structure of which is largely intact, although it suffered from subsidence before the canal closed. Trust volunteers have cleared the towpath above the lock, enabling walkers to reach a bridge located behind the Roman Way Hotel. Considerable work has been carried out on constructing an access ramp to the towpath and restoring the bridge, which often forms the backdrop to wedding photographs taken in the hotel grounds. Just beyond the bridge, another stream supplies water, but the canal bed is no longer owned by British Waterways after that, and has been filled in.

The A4601 crosses at Wedge Mills Bridge, but the original bridge and the lock were destroyed when the road was widened. Joveys Lock was quite shallow, and has been re-used as a course for the Wyrley Brook, which was diverted to accommodate a sewage works. The location of the next two locks, Rosemary's and Walkmill, which were also known as Bridgtown No. 2 and Bridgtown Top, now lies beneath an industrial estate. Great Wyrley Basin was located here, as was Hawkins Basin, which was connected to the canal be a channel which was crossed by a towpath bridge and a lift bridge, before it crossed the Wyrley Brook on an aqueduct to reach the 2-acre (0.81 ha) basin. The aqueduct was uncovered during the construction of the M6 Toll motorway, and was destroyed as part of that project. Reinstatement of the canal through this section will not be possible, and so a new route to the south of the original line is proposed, which has been protected by being included in the Local Plans of South Staffordshire and Cannock Chase District Councils.

The land surface where the Churchbridge locks were located was stripped away by open cast mining in the 1950s, and the route of the canal has been completely obliterated. Staffordshire County Council owns some land between the A5 road and the M6 Toll motorway, which has been identified as a suitable route for a new section of canal.

Read more about this topic:  Hatherton Canal

Famous quotes containing the word route:

    The route through childhood is shaped by many forces, and it differs for each of us. Our biological inheritance, the temperament with which we are born, the care we receive, our family relationships, the place where we grow up, the schools we attend, the culture in which we participate, and the historical period in which we live—all these affect the paths we take through childhood and condition the remainder of our lives.
    Robert H. Wozniak (20th century)

    A Route of Evanescence
    With a revolving Wheel—
    Emily Dickinson (1830–1886)

    By whatever means it is accomplished, the prime business of a play is to arouse the passions of its audience so that by the route of passion may be opened up new relationships between a man and men, and between men and Man. Drama is akin to the other inventions of man in that it ought to help us to know more, and not merely to spend our feelings.
    Arthur Miller (b. 1915)