Harrow and Wealdstone Rail Crash - Aftermath

Aftermath

The first emergency response arrived at 8:22 am with the fire brigade, ambulance and police services being assisted by doctors and a medical unit of the United States Air Force. Help was accepted from the Salvation Army, the Women's Voluntary Service and local residents. The first loaded ambulance left at 8:27 am and by 12:15 pm most of the injured had been taken to hospital. The search for survivors continued until 1:30 am the following morning.

There are three pairs of running lines through Harrow and Wealdstone station, and from east to west these are the slow lines, fast lines and the DC electric lines. All six lines were closed including the undamaged slow lines to allow the injured access to ambulances that left from the goods yard. The slow lines reopened at 5:32 am the following morning. The electric lines were used by cranes to remove the Liverpool locomotive and carriages and reopened 4:30 am on 11 October. The fast lines were reopened, with a speed restriction, at 8:00 pm on 12 October and a temporary footbridge was opened the same evening.

Read more about this topic:  Harrow And Wealdstone Rail Crash

Famous quotes containing the word aftermath:

    The aftermath of joy is not usually more joy.
    Mason Cooley (b. 1927)