Hardanger Line - History

History

During construction of the Voss Line from Bergen to Voss, there was a proposal to extend the line from Voss to Granvin on the Hardangerfjord. The plans were again taken up to consideration with the construction of the Bergen Line, but also this time the plans were scrapped. Some people wanted the line to be a tramway and when it was passed by the Parliament of Norway on 12 July 1919; the plans incorporated some elements of a tramway, giving the line a lower standard than the mainline. The railway was to be built electrified, and construction started in 1921. However, there was a lack of engineers, forcing a slow pace. On 5 November 1923, parliament passed the final plans for the railway, and the pace of construction was accelerated.

In 1927, Minister of Labour Worm Hirsch Darre-Jenssen of the Conservative Party stopped the work on the railway, stating that time had run out and that there instead should be built a road. By then, NOK 5 million had been invested and parliament decided that construction should continue. However, Darre-Jenssen convinced Hordaland County Council to make a statement against the Hardanger Line, the Flåm Line and the Namsos Line, without this stopping construction. In 1931, parliament reconsidered the electrification of the line, and there was consensus for electrification. The Hardanger Line opened on 1 April 1935 and became NSB's first line to be electrified at the time of opening. In February 1936, the line changed name from the Granvin Line to the Hardanger Line.

Three Class 64 electric multiple units (EMU) were delivered from Strømmens Værksted in 1934. Only 16 metres (52 ft) long, they were the smallest EMUs ever operated by NSB. In addition, four passenger cars were delivered, with each multiple unit able to haul two passenger cars. Occasionally, Class 64 trains were used on the Flåm Line, after it was electrified in 1944, and El 9-hauled trains from the Flåm Line used on the Hardanger Line.

In the first year of operation, the line had 60,850 passengers, significantly over expectations. After the opening, there were five daily round trips. In 1939, the extension of the longest tunnel started, because the near-by section was subject to landslides. It was completed by the German occupational forces during World War II, but not taken into use by the railway until 1945 because of the German military's use of the tunnel as an ammunition depot. Because of the electric traction, the line was not affected by the lack of coal during World War II, and in 1945 it had 285,900 passengers. After the end of the war, the number of daily round trips increased to seven, but this was reduced to six in the 1950s. In 1955, a morning and evening coach service started between Granvin and Voss. It was further extended in 1968, when it started corresponding with services on the Bergen Line.

Initially, the freight transport was small. During the war, transport increased many-fold, particularly because of export of lumber. In 1966, a spur was built just south of Palmafoss to Voss Cementvarefabrikk. By the end of the 1960s, the line was transporting 30,000 tonnes (30,000 long tons; 33,000 short tons). During the late 1970s, the amount of transport fel dramatically, and reached 11,000 tonnes (11,000 long tons; 12,000 short tons) in 1980. Nearly half of this was import of lumber to three sawmills and manufacturing companies. In 1972, Linjegods established a daily scheduled truck service to Granvin. Although Linjegods used train to and from Voss, the service from Voss to Granvin was operated parallel to the railway. In 1975, Tollpost Globe also established a similar service between Voss and Granvin. During the late 1970s, the manufacturer Bjølvefossen experienced a large drop in the demand of ferroalloys, reducing production—and thus transport on the line—by 10,000 tonnes (9,800 long tons; 11,000 short tons). Another issue for the line was that it has a permitted axle load of only 12 tonnes (12 long tons; 13 short tons); this either prehibited optimal wagon weights on the main lines, or causing transshipment at Voss, both causing increased costs. In 1977, the average distance for cargo shipped from the Hardanger Line was 444 kilometres (276 mi) by rail.

In 1980, the line had NOK 2.1 million in income, of which NOK 1.6 million was from freight (representing all revenue from freight that ran on the Hardanger Line). Operating expenses were NOK 4.8 million, and the deficit was covered by the national government. The line employed 21 people. In 1980, the estimated cost of upgrading the line to 18 tonnes (18 long tons; 20 short tons) axle load was NOK 9.6 million. Freight volume was then estimated to increase between 100 and 300 percent, and an upgrade was calculated to give a positive net present value, although it would not be sufficient to cover the full existing deficit. The plans included introduction of a refrigerated depot at Granvin. At the same time, it was estimated that the cost of retaining a 12-tonne (12-long-ton; 13-short-ton) axle load would require investments of NOK 6 million.

In 1979, the concession for passenger transport between Voss and Granvin was transferred from NSB's bus division to HSD and Bergen–Hardanger–Voss Billag. At the same time, the number of weekly services increased from 14 to 34. This was largely a result of the 1975 declaration by Hordaland County Council to support the closure of the line. In 1980, the railway had 60,000 passengers. A halt was opened at Mala in 1981, but then all passenger traffic was terminated on 2 June 1985. Class 64 had remained in use until the end, and there existed no political desire to invest in new rolling stock. Freight transport was retained, at first using El 9, and later shunting locomotives because of the lack of maintenance. From 1 March 1989, all transport on the line was terminated. NSB wanted to renovate the line and continue operations. Among the plans were to transport metal from the smelters in Hardanger via the Hardanger Line to Continental Europe. This would have required the axle load to be increased. Other plans were to extend some of the departures of the Bergen Commuter Rail from Voss to Granvin or operate commercially profitable tourist trains similar to the service provided on the Flåm Line.

The municipalities of Voss and Granvin wanted to use the right-of-way for a hiking and bicycle path, and NSB canceled their plans. Demolish started on 10 December 1991, although the section from Voss to Palmafoss was kept to serve a cement factory. Two of the Class 64 trains have been preserved by the Norwegian Railway Association and are based at the Old Voss Line in Bergen.

Read more about this topic:  Hardanger Line

Famous quotes containing the word history:

    Don’t give your opinions about Art and the Purpose of Life. They are of little interest and, anyway, you can’t express them. Don’t analyse yourself. Give the relevant facts and let your readers make their own judgments. Stick to your story. It is not the most important subject in history but it is one about which you are uniquely qualified to speak.
    Evelyn Waugh (1903–1966)

    To history therefore I must refer for answer, in which it would be an unhappy passage indeed, which should shew by what fatal indulgence of subordinate views and passions, a contest for an atom had defeated well founded prospects of giving liberty to half the globe.
    Thomas Jefferson (1743–1826)

    When we of the so-called better classes are scared as men were never scared in history at material ugliness and hardship; when we put off marriage until our house can be artistic, and quake at the thought of having a child without a bank-account and doomed to manual labor, it is time for thinking men to protest against so unmanly and irreligious a state of opinion.
    William James (1842–1910)