Future Development
In the 2012 Rail Budget, Railway Minister Dinesh Trivedi announced projects that include fast train corridors between CST-Panvel and Virar-Vasai-Diva-Panvel sections, operation of 12-car trains on the Harbour Line to bring down congestion, and a direct rail link from the Panvel station to the proposed Navi Mumbai International Airport. A feasibility study on building a new link between this airport and will also be conducted.
Work is currently underway to extend the Harbour Line up to Goregaon. The project will cost 103 crore (US$18.75 million). It is expected to be completed by March 2014. Further extension of this line has been accepted under MUTP III till Borivali.
Harbour Line services will be converted to 12-car by March 2015. This is expected to increase the carrying capacity of the harbour line by nearly 33%. The crore project will cost 750 crore and about 153 more coaches will be required.
Read more about this topic: Harbour Line (Mumbai Suburban Railway)
Famous quotes containing the words future and/or development:
“The normal present connects the past and the future through limitation. Contiguity results, crystallization by means of solidification. There also exists, however, a spiritual present that identifies past and future through dissolution, and this mixture is the element, the atmosphere of the poet.”
—Novalis [Friedrich Von Hardenberg] (17721801)
“Understanding child development takes the emphasis away from the childs characterlooking at the child as good or bad. The emphasis is put on behavior as communication. Discipline is thus seen as problem-solving. The child is helped to learn a more acceptable manner of communication.”
—Ellen Galinsky (20th century)