Construction
In September 1902 a member of the Atbara Class, no. 3405 Mauritius, was reboilered with a tapered domeless boiler and Belpaire firebox. The locomotive was the first GWR 4-4-0 to be fitted with a tapered boiler; the boiler became the prototype for Churchward's Standard No. 4 boiler. In March 1903 the first of the City Class, no. 3433 City of Bath, was completed. It was fitted with the final form of the Standard No.4 boiler, with slightly curved sides and a tapered top to the firebox. Another nine locomotives were completed in May 1903. Between February 1907 and December 1908 nine Atbaras were rebuilt with this boiler and incorporated into the City Class. All members of the class were withdrawn between October 1927 and May 1931.
Read more about this topic: GWR 3700 Class
Famous quotes containing the word construction:
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)
“Theres no art
To find the minds construction in the face:
He was a gentleman on whom I built
An absolute trust.”
—William Shakespeare (15641616)
“Striving toward a goal puts a more pleasing construction on our advance toward death.”
—Mason Cooley (b. 1927)