Gotthard Rail Tunnel
The Gotthard Tunnel (German: Gotthardtunnel, Italian: Galleria del San Gottardo) is a 15-kilometre (9 mi) long railway tunnel and forms the summit of the Gotthard Railway in Switzerland. It connects Göschenen with Airolo and was the first tunnel through the Gotthard massif. It is built as one double-track, standard gauge tunnel.
The tunnel rises from the northern portal at Göschenen (1106 metres / 3650 ft) and the highest point (1151 metres, or 3800 ft) is reached after approximately 8 kilometres (5 mi). After two more kilometers, the border between the cantons of Uri and Ticino is passed; after another 5 kilometres (3 mi), the tunnel ends at the southern portal near to Airolo (1142 metres, or 3770 ft). The trip takes about seven to eight minutes by train. Services are operated by the Swiss national railway company SBB-CFF-FFS.
Read more about Gotthard Rail Tunnel: Construction, Operation, Neighbouring Tunnels
Famous quotes containing the words rail and/or tunnel:
“We rail at trade, but the historian of the world will see that it was the principle of liberty; that it settled America, and destroyed feudalism, and made peace and keeps peace; that it will abolish slavery.”
—Ralph Waldo Emerson (18031882)
“You may raise enough money to tunnel a mountain, but you cannot raise money enough to hire a man who is minding his own business.”
—Henry David Thoreau (18171862)