From 1817 onwards the Poor Employment Act meant it was possible for the company to loan money from the Exchequer Bill Loan Commission. This along with further share issues provided enough money to bring the scheme to completion. After these significant delays, the canal opened in April 1827. In the course of its construction the canal had cost £440,000. As opened the canal was 86½ feet wide, 18 feet (5.5 m) deep and could take craft of up to 600 tons. The longer of the two locks onto the canal proper was 115 feet (35 m) long.