Contamination

Mining operations over four decades created a massive environmental liability, a problem which the mine's previous owners left to the Canadian and Northwest Territories governments to sort out. The Giant Mine contains 237,000 t (233,000 long tons; 261,000 short tons) of arsenic trioxide dust produced during the gold roasting process. This dust is water soluble and contains approximately 60% arsenic. The site's 950 ha (2,300 acres) footprint includes 8 open pits, 4 tailing ponds, 325,000 m3 (11,500,000 cu ft) of contaminated soils, and approximately 100 buildings including a roaster/bag house complex that is highly contaminated with arsenic and fibrous asbestos. A $400 million (probably more) taxpayer-funded remediation project is underway. A main aspect of the successful proposed solution, known as the "Frozen Block Alternative," is to permanently freeze the arsenic trioxide storage chambers to keep groundwater seepage out.

Read more about this topic:  Giant Mine