The Versova-Andheri-Ghatkopar Metro corridor of the Mumbai Metro project will be a 11.07 km long double line corridor on an elevated viaduct. The route will use Standard Gauge air-conditioned trains with 12 elevated stations. It will have a carrying capacity of 60,000 persons per hour and the commuting time on the entire stretch would be 21 minutes. Today the commuting time between Versova and Ghatkopar is 70 minutes. Line 1 operations are now expected to start in March 2013.