Construction and Numbering
The GCR built 21 locomotives at Gorton Works in three batches between 1911 and 1917. They ordered a fourth batch of ten from Gorton, but this was not built until after the 1923 Grouping, under which GCR became part of the newly-formed London and North Eastern Railway (LNER). The LNER then ordered a fifth batch of 13 to a modified design, incorporating reduced boiler mountings and detail differences, and these were built by the outside contractors Hawthorn, Leslie & Co. during 1925–26 (works numbers 3616–28).
Year | GCR Nos. | LNER Nos. | LNER 1946 Nos. |
---|---|---|---|
1911 | 165–170, 23–24, 447–8 | 5165–70, 5023–4, 5447–8 | 9800–7, –, 9808 |
1912 | 449–452, 128–129 | 5449–5452, 5128–5129 | 9809–9814 |
1917 | 371–374, 411 | 5371–5374, 5411 | 9815–9819 |
1923 | 3, 6, 7, 30, 45, 46, 88, 154, 156, 158 |
5003, 5006, 5007, 5030, 5045, 5046, 5088, 5154, 5156, 5158 |
9820–9829 |
1925-26 | — | 1712/9, 1738, 1750/6, 1760/6/7/8, 1771, 1782/4, 1790 |
9830–9842 |
No. 5447 was withdrawn in 1942, because the frames were badly cracked. In 1943, the others were allocated new numbers in the 9800–42 block, but these were not applied until 1946. Forty-three locomotives passed to British Railways in 1948, and between 1948 and 1951 their numbers were increased by 60000. The class was divided into two parts in December 1948 as follows:
- A5/1, 69800-69829: Built at Gorton to Robinson's design
- A5/2, 69830-69842: Built by Hawthorn, Leslie with modifications by Gresley
None have been preserved.
Read more about this topic: GCR Class 9N
Famous quotes containing the words construction and/or numbering:
“Theres no art
To find the minds construction in the face:
He was a gentleman on whom I built
An absolute trust.”
—William Shakespeare (15641616)
“The task he undertakes
Is numbering sands and drinking oceans dry.”
—William Shakespeare (15641616)