Design and Construction
Designed by Thomas Parker for the Manchester, Sheffield and Lincolnshire Railway (MS&LR), the prototype 9F was built in 1891. A total of 12 batches were constructed up to 1901, with 131 locos being completed. The MS&LR changed its name to the GCR in 1897. The GCR 9F locos were reclassified as N5 under the LNER locomotive numbering and classification system when the GCR was absorbed into the London & North Eastern Railway after the 1923 grouping. It was the first design for a British railway to use the Belpaire firebox.
Read more about this topic: GCR Class 9F
Famous quotes containing the words design and/or construction:
“Nowadays the host does not admit you to his hearth, but has got the mason to build one for yourself somewhere in his alley, and hospitality is the art of keeping you at the greatest distance. There is as much secrecy about the cooking as if he had a design to poison you.”
—Henry David Thoreau (18171862)
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)