Construction Technology
By the end of May 2008, nearly a third of tunnelling was completed, and excavation of the tunnels was completed on 11 September 2009.
A mixed-face Earth Pressure Balance Shield Tunnel Boring Machine (TBM) was designed and built in Germany by Herrenknecht specifically to cope with complex underground conditions and was the first such machine employed in South Africa. The TBM, named Imbokodo (meaning "rock"), installs pre-cast concrete tunnel lining segments behind it as it moves forward. It leaves behind a watertight and smooth lining to the 6.8 m (22 ft 4 in) diameter tunnel.
Read more about this topic: Gautrain, History, Construction
Famous quotes containing the words construction and/or technology:
“No real vital character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the authors personality, developing by internal necessity as much as by external addition.”
—T.S. (Thomas Stearns)
“The successor to politics will be propaganda. Propaganda, not in the sense of a message or ideology, but as the impact of the whole technology of the times.”
—Marshall McLuhan (19111980)