Fulton Street Line (elevated) - History

History

The Kings County Elevated Railway opened the line, from dual western terminals at Fulton Ferry and Brooklyn Bridge (Sands Street) east to Nostrand Avenue, on April 24, 1888. It was extended east to Albany Avenue on May 30, 1888; Albany Avenue was an eastbound-only station, and the westbound station just beyond at Sumner Avenue had yet to be completed, so it temporarily served both directions. The line was further extended to Ralph Avenue on September 20, 1888 and completed to BMT Fulton Street Line at the west end of East New York in early November.

The Fulton Elevated Railroad was incorporated on July 6, 1888 to build a disconnected line from Greenpoint south through Williamsburg to Kent and Myrtle Avenues, and to extend the Kings County Elevated east beyond Rockaway Avenue to the city line. The former was not built, but construction soon began on the latter. The first piece, over Fulton Street and Williams Place, opened on July 4, 1889, connecting with the Long Island Rail Road's Manhattan Crossing station at the new terminal at Atlantic Avenue. It was extended further, over Snediker Avenue and Pitkin Avenue, to Van Siclen Avenue on November 18, 1889; due to a shortage of wood for a storage yard, a temporary shuttle was operated between Pennsylvania Avenue and Van Siclen Avenue until mid-December. Construction above Pitkin Avenue progressed to Linwood Street on February 22, 1892 and Montauk Avenue on March 21, 1892. The line was completed to Grant Avenue at City Line on July 16, 1894, with the opening of a structure above Pitkin Avenue, Euclid Avenue, and Liberty Avenue.

The Kings County Elevated leased the Brooklyn and Brighton Beach Railroad on February 5, 1896. A two-block elevated connection between Franklin Avenue station and the Brighton Beach Line's Bedford station, including a new station at Dean Street, opened on August 15, 1896, and the Kings County Elevated began operating trains between the Brooklyn Bridge (Sands Street) and Brighton Beach.

The final extension, from Grant Avenue east to Lefferts Avenue, was built under the Dual Contracts and opened on September 25, 1915. The Dual Contracts also triple-tracked the line. Trains last ran on the line west of Rockaway Avenue on May 31, 1940; a free transfer was provided to the IND Fulton Street Line at Rockaway Avenue and a new "Fulton–Lexington Avenue" service via the Lexington Avenue Elevated west of East New York was introduced. The line west of Hudson Street was closed on April 26, 1956, and IND Fulton Street Line (A) trains began using the line east of Hudson Street on April 29.

Read more about this topic:  Fulton Street Line (elevated)

Famous quotes containing the word history:

    I believe that in the history of art and of thought there has always been at every living moment of culture a “will to renewal.” This is not the prerogative of the last decade only. All history is nothing but a succession of “crises”Mof rupture, repudiation and resistance.... When there is no “crisis,” there is stagnation, petrification and death. All thought, all art is aggressive.
    Eugène Ionesco (b. 1912)

    When the history of this period is written, [William Jennings] Bryan will stand out as one of the most remarkable men of his generation and one of the biggest political men of our country.
    William Howard Taft (1857–1930)

    Anything in history or nature that can be described as changing steadily can be seen as heading toward catastrophe.
    Susan Sontag (b. 1933)