Fukuoka Subway 3000 Series - History

History

The 3000 series was introduced on 3 February 2005 on the newly opened Nanakuma Line between Tenjin-Minami and Hashimoto. Unlike the 1000 series and 2000 series trains operated on the Kūkō Line and Hakozaki Line, the 3000 series trains are standard gauge (1,435 mm) and use linear motor propulsion.

Read more about this topic:  Fukuoka Subway 3000 Series

Famous quotes containing the word history:

    “... all big changes in human history have been arrived at slowly and through many compromises.”
    —Eleanor Roosevelt (1884–1962)

    “Let us not underrate the value of a fact; it will one day flower in a truth. It is astonishing how few facts of importance are added in a century to the natural history of any animal. The natural history of man himself is still being gradually written.”
    —Henry David Thoreau (1817–1862)

    “We said that the history of mankind depicts man; in the same way one can maintain that the history of science is science itself.”
    —Johann Wolfgang Von Goethe (1749–1832)