Frankenstadion - Renovations

Renovations

The Frankenstadion has been renovated two times, once in 1988 to 1991, and then again renovation began again in 2002, to be ready in time for the 2006 World Cup. The 2002 renovation cost €56.2 million; the cost is split between the city of Nürnberg, the State of Bavaria and the building society, which managed the stadium. The stadium has had its capacity increased to 48,548. this modernisation was designed and realized by HPP Architects. This was achieved by extending the southwest and northwest grandstand. The playing field was lowered by 1.30 metres in order to provide all seats an unrestricted view of the field. The Max Morlock place was developed as a place for fans to meet and enjoy something to eat; the total area of this place is 1,000 metres. In the summer of 2012, the capacity was increased to 50,000.

Read more about this topic:  Frankenstadion