Fowler Ridge Wind Farm - Phase Two

Phase Two

Phase two consists of 133 GE 1.5 MW wind turbines with a nameplate capacity of 200 MW. Construction began in early 2009 and phase two became operational in early 2010.

Read more about this topic:  Fowler Ridge Wind Farm

Famous quotes containing the word phase:

    The Indians feel that each stage is crucial and that the child should be allowed to dwell in each for the appropriate period of time so that every aspect of his being can evolve, just as a plant evolves in the proper time and sequence of the seasons. Otherwise, the child never has a chance to master himself in any one phase of his life.
    Alan Quetone (20th century)

    It no longer makes sense to speak of “feeding problems” or “sleep problems” or “negative behavior” is if they were distinct categories, but to speak of “problems of development” and to search for the meaning of feeding and sleep disturbances or behavior disorders in the developmental phase which has produced them.
    Selma H. Fraiberg (20th century)