The first phase of the project is online and consists of 222 wind turbines, 182 Vestas V82-1.65 MW turbines and 40 Clipper C-96 2.5 MW turbines, with a nameplate capacity of 400 MW.
Read more about this topic: Fowler Ridge Wind Farm
Famous quotes containing the word phase:
“It no longer makes sense to speak of feeding problems or sleep problems or negative behavior is if they were distinct categories, but to speak of problems of development and to search for the meaning of feeding and sleep disturbances or behavior disorders in the developmental phase which has produced them.”
—Selma H. Fraiberg (20th century)
“The Indians feel that each stage is crucial and that the child should be allowed to dwell in each for the appropriate period of time so that every aspect of his being can evolve, just as a plant evolves in the proper time and sequence of the seasons. Otherwise, the child never has a chance to master himself in any one phase of his life.”