Florida State Road 417 - Route Description

Route Description

The Southern Connector as well as the beltway begins at an interchange with Interstate 4 in Celebration. This section, run by Florida's Turnpike Enterprise is 6.4-mile (10.3 km) long, extending to the International Drive interchange.

Between the International Drive and Aloma Avenue interchanges in Orange County, the tollway is known as the Central Florida GreeneWay, and is operated by OOCEA.

The Seminole Expressway section of the tollway begins at the north end of the Aloma Avenue interchange. This section, also run by Florida's Turnpike Enterprise is 17-mile (27 km) long, extends to an interchange with I-4 in Sanford at the end of the beltway.

Read more about this topic:  Florida State Road 417

Famous quotes containing the words route and/or description:

    “In the mountains the shortest route is from peak to peak, but for that you must have long legs. Aphorisms should be peaks: and those to whom they are spoken should be big and tall of stature.”
    —Friedrich Nietzsche (1844–1900)

    “It is possible—indeed possible even according to the old conception of logic—to give in advance a description of all ‘true’ logical propositions. Hence there can never be surprises in logic.”
    —Ludwig Wittgenstein (1889–1951)