The Current Bridge
The new bridge has a horizontal clearance of 300 feet (91 m) and 156 feet (47.5 m) vertical clearance above the low water level in the fully raised position. In the lowered position, the vertical clearance is less than five feet above the low water level. position.
Most of the marine usage of the Florida Avenue site consists of towboat and barge traffic transiting from the Mississippi River, through the Corps of Engineer's Inner Harbor-Navigational CanalLock, then east following the Gulf Intracoastal Waterway. The lift bridge is capable of sufficient vertical clearance for ship traffic.
The bridge has undergone repairs due to Hurricane Katrina storm surge in 2005. It sustained flooding once again due to Hurricane Gustav in 2008. Operations of the Port of New Orleans' four bridges across the Inner Harbor-Navigational Canal, including special alerts, can be found at wwww.portno.com at the link for citizen resources at the link for bridges.
Read more about this topic: Florida Avenue Bridge
Famous quotes containing the words current and/or bridge:
“It is a quite remarkable fact that the great religions of the most civilized peoples are more deeply fraught with sadness than the simpler beliefs of earlier societies. This certainly does not mean that the current of pessimism is eventually to submerge the other, but it proves that it does not lose ground and that it does not seem destined to disappear.”
—Emile Durkheim (18581917)
“What need the bridge much broader than the flood?”
—William Shakespeare (15641616)