Fernald Preserve
The $4.4 billion cleanup of the surface areas was completed in December 2006, and the site was turned into the Fernald Preserve nature preserve. Thousands of tons of contaminated concrete, sludge, liquid waste, and soil were removed from the site and replaced with man-made wetlands and greenery.
Ongoing cleanup operations include routine monitoring of the environmental conditions with test wells, including the uranium groundwater plume extending south of the plant area, storage of residual waste onsite, and filtering of uranium contamination from the Great Miami Aquifer. These cleanup operations, along with restrictions on establishing new wells in areas exceeding water contaminant limits, will continue for the foreseeable future.
Read more about this topic: Fernald Feed Materials Production Center
Famous quotes containing the word preserve:
“As the House is designed to provide a reflection of the mood of the moment, the Senate is meant to reflect the continuity of the pastto preserve the delicate balance of justice between the majoritys whims and the minoritys rights.”
—Lyndon Baines Johnson (19081973)