Fen Line - Infrastructure

Infrastructure

Traction current for electric trains is provided by 25 kV AC OHLE controlled by Romford Electrical Control Room. The line has a loading gauge of W8 except for the section connecting the Ipswich to Ely Line to the Ely to Peterborough Line which is W10.

Read more about this topic:  Fen Line