Fastrack - Routes

Routes

Fastrack began operating with the introduction of Fastrack B on 26 March 2006 between Dartford and Gravesend, serving Darent Valley Hospital, Bluewater, Greenhithe railway station (and Ebbsfleet International since it opened in November 2007). It operates up to a ten-minute frequency. Services start before 6am and run until after midnight.

The 9.5 km (5.9 mi) long Fastrack A was added to the network on 3 June 2007. It operates up to every seven minutes between Dartford and Bluewater along the western side of Temple Hill, Crossways Business Park, Greenhithe railway station and The Bridge, Dartford. Fastrack A is funded by ProLogis, the developers of The Bridge, Dartford.

It is hoped that Fastrack C, a circular route in the Bluewater / Greenhithe area, and Fastrack D, running from Bluewater to Gravesend via Northfleet, will come into service in the future.

Read more about this topic:  Fastrack

Famous quotes containing the word routes:

    The myth of independence from the mother is abandoned in mid- life as women learn new routes around the mother—both the mother without and the mother within. A mid-life daughter may reengage with a mother or put new controls on care and set limits to love. But whatever she does, her child’s history is never finished.
    Terri Apter (20th century)