Mission Spacewalkers Start (UTC) End (UTC) Duration

Peggy Whitson
Yuri Malenchenko
9 November 2007
09:54
9 November,
16:49
6 hours, 55 minutes
SSPTS cable disconnect and stowage, PMA-2 umbilical stowage, Node 2 avionics umbilical temp stowed.

Whitson
Daniel M. Tani
20 November 2007
10:10
20 November,
17:26
7 hours, 16 minutes
External configuration of PMA-2 and Harmony: Fluid, electrical, and data line hookups, avionics line hookup, heater cable hookups, Fluid tray relocation.

Whitson
Tani
24 November 2007
09:50
24 November,
16:54
7 hours, 04 minutes
Completion of fluid, electrical, and data line hookups for PMA-2 and Harmony. Loop B Fluid Tray connection to port side of Destiny. Photographic analysis of starboard Solar Alpha Rotary Joint (SARJ) to assist with troubleshooting on the ground, re-installation of CETA cart from a temporary stowage location.

Whitson
Tani
18 December 2007
09:50
18 December,
16:46
6 hours, 56 minutes
Inspection of the S4 starboard Solar Alpha Rotary Joint (SARJ), and a Beta Gimbal Assembly (BGA). The EVA is the 100th in support of building the International Space Station.

Whitson
Tani
30 January 2008
09:56
30 January,
17:06
7 hours, 10 minutes
Replacement of a Bearing Motor Roll Ring Module (BMRRM) in the S4 starboard Beta Gimbal Assembly (BGA), further inspection of the Solar Alpha Rotary Joint (SARJ).