Essex Memorial Arena - Completing The Construction

Completing The Construction

The Essex community was not completely supportive of the arena building project. They feared the arena would increase water rates in town, and that the arena was an unsafe structure. By the fi nal stages of construction funds were drying up and $100,000 would be needed to complete it. Many felt that the project was just too big for the town. On June 19, 1961 the town went to the polls to settle the issue, voting 551 to 392 in favour of the arena loan. The loan was obtained and the building was completed within the year. The walls were made of 12” (30.5 cm) thick reinforced masonry blocks. The roof is supported by eleven trusses. The arena has heated dressing rooms, a canteen and 1054 seats. It took roughly 937 days to fully complete the arena. The Essex Memorial Arena Campaign Committee was then dissolved and the town took control and created an Arena Commission.

The arena officially opened on November 25, 1961.

Read more about this topic:  Essex Memorial Arena

Famous quotes containing the words completing and/or construction:

    The inhabitants of St. John’s and vicinity are described by an English traveler as “singularly unprepossessing,” and before completing his period he adds, “besides, they are generally very much disaffected to the British crown.” I suspect that that “besides” should have been a “because.”
    Henry David Thoreau (1817–1862)

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)