Eos (yacht) - Construction

Construction

Eos was launched in Bremen, Germany from the Lürssen yard in 2006. The ship took three years to build. When launched, she "knocked Athena off the number one spot ." Bill Langan was the designer, Rondal/Huisman supplied the rig, and the remaining naval architecture was completed by Lürssen. The interior was designed by François Catroux. The 200 feet (61 m) tall masts are "the maximum height allowed to enable the craft to pass underneath bridges cross the globe."

Read more about this topic:  Eos (yacht)

Famous quotes containing the word construction:

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)