Environmental Quality Management - Anthrax Emergency Response Cleanup

Anthrax Emergency Response Cleanup

The Hart Senate Office Building was closed on October 17, 2001, when aides to Senate Majority Leader Tom Daschle opened an anthrax-laced letter in his office. Several other congressional office buildings also showed evidence of anthrax contamination and had to be fumigated.

Responding to these life-threatening hazards, EQ was on site at Capitol Hill within 24 hours with crews and equipment to develop biocidal treatment of Bacillus Anthracis endospores. EQM led, developed, and trained multiple contractors to deal with personnel, equipment, and gasification decontamination.

EQM developed “Sampling for Anthrax” training. EQM also designed, constructed, and manned modular multi-chamber decontamination containment systems in three locations in the Hart Senate Office Building. EQM refined construction units to make them quicker to assemble during daily setup and tear-down. EQM developed handbooks, established Standard Operating Procedures, and taught specialized decontamination procedures.

Read more about this topic:  Environmental Quality Management

Famous quotes containing the words emergency and/or response:

    In this country, you never pull the emergency brake, even when there is an emergency. It is imperative that the trains run on schedule.
    Friedrich Dürrenmatt (1921–1990)

    There are situations in life to which the only satisfactory response is a physically violent one. If you don’t make that response, you continually relive the unresolved situation over and over in your life.
    Russell Hoban (b. 1925)