Englewood, Chicago - Infrastructure

Infrastructure

Both the Red Line (Chicago Transit Authority) and Green Line (Chicago Transit Authority) run through Englewood, as does the Dan Ryan Expressway.

The railroad junction at Englewood, where Metra (the former Rock Island) crosses Norfolk Southern (the former Pennsylvania) has long been a cause of delay. In March 2010 a $133 million reconstruction project was announced which will improve operations by replacing the diamond crossing between Metra and NS with a flyover for Metra. The project is expected to be completed in 2014.

Read more about this topic:  Englewood, Chicago