Egyptian Public Works - The Modern Period (1952 To Present)

The Modern Period (1952 To Present)

Egyptian engineers operated the Department after Egypt was liberated from the British rule. The biggest and most complicated of all public works in Egyptian history (Aswan High Dam) was constructed during this period. This period experienced influence of Soviet engineers in the 1950s and the 1960s. This was replaced by some influence of American engineers in the 1980s and the 1990s.

Currently, all the public works in Egypt are controlled by the Ministry of Water Resources and Irrigation. The goal of the Ministry of Water Resottrces and Irrigation is to implement feasible projects that will increase agricultural productivity. The lrrigation Improvement Project was designed to do that through improving the conveyance efficiency on both the main system, the mesqa system and on-farm level.

Read more about this topic:  Egyptian Public Works

Famous quotes containing the words modern and/or period:

    The critical method which denies literary modernity would appear—and even, in certain respects, would be—the most modern of critical movements.
    Paul Deman (1919–1983)

    The easiest period in a crisis situation is actually the battle itself. The most difficult is the period of indecision—whether to fight or run away. And the most dangerous period is the aftermath. It is then, with all his resources spent and his guard down, that an individual must watch out for dulled reactions and faulty judgment.
    Richard M. Nixon (1913–1995)