Design and Construction
The EcoPark occupies 200,000 square metres of land in Tuen Mun Area 38 and will be developed in two phases. As pledged in the Policy Framework, the aim is to commission Phase I of EcoPark (80,000 square metres) towards the end of 2006 and Phase II (120,000 square metres) in 2009. Hong Kong Government funding will be used to build the basic infrastructure of EcoPark.
The EcoPark will be divided into lots of different sizes. Lots in EcoPark will be tendered for specific recovered materials and processes that help achieve Hong Kong's government waste management objectives, in particular, in recycling local wastes. Admission criteria will be developed with priority given to processes involving value-added technologies, and target materials of the proposed Producer Responsibility Schemes.
Read more about this topic: Eco Park (Hong Kong)
Famous quotes containing the words design and/or construction:
“Joe ... you remember I said you wouldnt be cheated?... Nobody is really. Eventually all things work out. Theres a design in everything.”
—Sidney Buchman (19021975)
“Striving toward a goal puts a more pleasing construction on our advance toward death.”
—Mason Cooley (b. 1927)