Renovations
In recent years the school has had a number of much needed renovations. A new library, dance studio, front steps, elevator, a re-vitalized woodworking shop, a (recently demolished) costume room, and a brand new sprinkler system completed in 2005 to bring the school up to fire code.
Beginning March 2007, a massive renovation began at the school, which includes new windows for the whole building, new ventilation system, new boiler system, and hiding the sprinkler pipes installed 2 years prior. Air conditioning is being installed, but will not be available to the whole school, only certain special parts will have it (such as computer labs) but the average classroom will not.
Read more about this topic: Eastwood Collegiate Institute