Downtown MRT Line

Downtown MRT Line

The Downtown Line (DTL) will be the fifth Mass Rapid Transit line in Singapore. It is due to be opened in three stages, in 2013, 2015 and 2017 respectively. When fully complete, the line will be about 42 km (26 mi) long with 34 stations and serve about half a million commuters daily, making it the longest underground and driverless MRT line in Singapore. Travelling from one end to the other will take about 65 minutes. The line is coloured blue in the rail map.

Read more about Downtown MRT Line:  Overview, History, Stations, Rolling Stock, Train Control, Operator

Famous quotes containing the word line:

    In order to get to East Russet you take the Vermont Central as far as Twitchell’s Falls and change there for Torpid River Junction, where a spur line takes you right into Gormley. At Gormley you are met by a buckboard which takes you back to Torpid River Junction again.
    Robert Benchley (1889–1945)