Dnieper Hydroelectric Station - Early Plans

Early Plans


In the lower current of the Dnieper River there were almost 100 km long part of the river filled with rapids. Now this is the distance between the modern cities Dnepropetrovsk and Zaporozhie In the 19th century engineers worked on the projects to make the river navigable. The projects for the flooding of the rapids were proposed by N. Lelyavsky in 1893, V. Timonov(RU) in 1894, S. Maximov and G. Graftio(RU) in 1905, A. Rundo and D. Yuskevich in 1910, I. Rozov and L. Yurgevich in 1912, Mohylko. While the main objective of these projects was to improve navigation, hydropower generation appeared concurrently, in terms of "utiliztion of the freely flowing water". G. Graftio's(RU) project of 1905 included three dams with a small area of flooding.

Read more about this topic:  Dnieper Hydroelectric Station

Famous quotes containing the words early and/or plans:

    O troubled forms, O early love unfortunate and hard,
    Time has estranged you into a jewel cold and pure;
    Edna St. Vincent Millay (1892–1950)

    We for a certainty are not the first
    Have sat in taverns while the tempest hurled
    Their hopeful plans to emptiness, and cursed
    Whatever brute and blackguard made the world.
    —A.E. (Alfred Edward)