Dix Dam - Current Status

Current Status

The original hydroelectric plant is now used mainly when heavy rainfall results in above normal lake elevation. The plant produces 24 megawatts of power with all three units on. The three coal-fired generators can produce 700 megawatts of electricity, more than one-fifth of KU's total capacity. An average of 15,000,000 short tons (1.4×1010 kg) of coal is burned annually at Brown Station. Four of the combustion turbine units can deliver 110 megawatts each; the other two can produce 164 megawatts each. During periods of high demand, the combustion turbines can be started and come to full load in just 30 minutes.

Read more about this topic:  Dix Dam

Famous quotes containing the words current and/or status:

    I have come to believe ... that the stage may do more than teach, that much of our current moral instruction will not endure the test of being cast into a lifelike mold, and when presented in dramatic form will reveal itself as platitudinous and effete. That which may have sounded like righteous teaching when it was remote and wordy will be challenged afresh when it is obliged to simulate life itself.
    Jane Addams (1860–1935)

    screenwriter
    Policemen so cherish their status as keepers of the peace and protectors of the public that they have occasionally been known to beat to death those citizens or groups who question that status.
    David Mamet (b. 1947)