History
The Dickerson plant began service in 1959. All of the generating plants at the Dickerson Generating Station were built by the Potomac Electric Power Company, which sold them to the Southern Company in December 2000 as a result of the restructuring of the electricity generating industry in Maryland. The station was included in the spin-off from the Southern Company of Mirant in April 2001, which has since operated and maintained the plant.
In 1991, the 900-foot (270 m)-long cooling water discharge channel from the power plant, which empties into the Potomac River, became the Dickerson Whitewater Course, a canoe and kayak training facility for the 1992 Olympic Games.
The Montgomery County Resource Recovery Facility began operations in 1995.
In December 2009, a $1.1 billion emissions upgrade was completed. A new stack and cooling system reduced the amount of waste heat going into the cooling water discharge channel.
Read more about this topic: Dickerson Generating Station
Famous quotes containing the word history:
“... that there is no other way,
That the history of creation proceeds according to
Stringent laws, and that things
Do get done in this way, but never the things
We set out to accomplish and wanted so desperately
To see come into being.”
—John Ashbery (b. 1927)
“The custard is setting; meanwhile
I not only have my own history to worry about
But am forced to fret over insufficient details related to large
Unfinished concepts that can never bring themselves to the point
Of being, with or without my help, if any were forthcoming.”
—John Ashbery (b. 1927)
“It is remarkable how closely the history of the apple tree is connected with that of man.”
—Henry David Thoreau (18171862)