Dee Bridge Disaster - Investigation

Investigation

The investigation was one of the first major inquiries conducted by the newly formed Railway Inspectorate. The lead investigator was Captain Simmons of the Royal Engineers, and his report suggested that repeated flexing of the girder weakened it substantially. He examined the broken parts of the main girder, and confirmed that the girder had broken in two places, the first break occurring at the centre. He tested the remaining girders by driving a locomotive across them, and found that they deflected by several inches under the moving load. He concluded that the design was basically flawed, and that the wrought iron trusses fixed to the girders did not reinforce the girders at all, which was a conclusion also reached by the jury at the inquest. Stephenson's design had depended on the wrought iron trusses to strengthen the final structures, but they were anchored on the cast iron girders themselves, and so deformed with any strain on the bridge.

Stephenson maintained that the locomotive derailed whilst crossing the bridge, and the impact force against the girder caused it to fracture. However, eye witnesses said that they saw the girder break first, and the locomotive and tender remained on the track at the far side of the bridge. Indeed, the driver raced on to the next station to warn of the accident and prevent any traffic using the line. He then came back on the other side and drove to Chester where he gave a similar warning.

Read more about this topic:  Dee Bridge Disaster